Dresser Case Study Testing
Flier 
Live Gas Equipment Testing
Facility In the field,
there is no room for error. At GCI, we give you the capability to safely and
accurately test your natural gas equipment on a live natural gas pipeline. Our
facility is located on a mainline interconnect with all pipeline located above
ground and flanged. We can custom configure a test scenario that meets your
needs as well as your budget.
The GCI Test Facility
Features:
- Live gas pipelines for testing natural gas equipment
- Configurable to meet specific customer needs
including testing new designs
- Supports all types of equipment used in natural gas
pipelining
- On-site pipeline operations and custody transfer
measurement expertise
- Tested to specific operations requirements for real world, applied
equipment performance data with minimal risk and cost
About the GCI Test
Facility:
- Constructed in 1979 by United Gas Pipeline as a
training facility for field technicians
- Located between a 30-inch mainline operating at 725
psi and 18-inch feed line operating at 525 psi
- Facility features both a 8-inch above ground ANSI 300
header and 4-inch above ground header – located under a shed with an overhead
crane
- The 4-inch and 8-inch manifolds are segregated into separate
lines so each section can be isolated
|